Place of Origin: | Jiangsu, China |
Brand Name: | Nanyang |
Certification: | CE |
Price: | CN¥1,986,723.07/sets 1-1 sets |
---|---|
Packaging Details: | Sea worthy packing |
Supply Ability: | 170 Set/Sets per Year |
Video Outgoing-inspection: | Provided | Machinery Test Report: | Provided |
---|---|---|---|
Core Components: | PLC, Bearing, Gearbox, Motor, Pump | Type: | Pipe Mill |
Pipe Material: | Carbon Steel(Q345B) | Application: | Energy Supply Pipe |
Production Capacity: | 50 Tons/8 Hours | Voltage: | 220V/380V/415V/440V |
Power(w): | According To Machine Model | Dimension(L*W*H): | 50m*6m*2.8m |
Weight: | Aboutkg | Warranty: | One Year |
Key Selling Points: | Easy To Operate | Pipe Shape: | Round/Square/ Rectangle |
Color: | As Per Customer Request | Welding Type: | High Frequrency Induction Welding |
Pipe Diameter: | 22-63.5mm | Thickness: | 1.2-4.5mm |
Milling Speed: | 20-60M/min | Main Motor Power: | 132KW*2sets |
Showroom Location: | None | Marketing Type: | New Product 2020 |
Warranty Of Core Components: | 1 Year | Condition: | New |
Applicable Industries: | Building Material Shops, Manufacturing Plant, Construction Industry |
Q: Which products your company are manufacturing?
A:Our company main products is Carbon steel/GI pipe pipe making machine and also we can make Stainless steel pipe making machine.
Q: What advantage for the machine?
A:We have Adopt first class suppliers. like "Hangzhou Xinhengli" DC Motor, "GUOMAO" Reducer, Siemens AC motor on the machine.
Q: Can you print the company name or logo on the pipes?
A: Yes. We can print your logo or company name on the pipes by Stamping or Coating.
Q: What payment terms you can accept?
A: We can accept payment terms by T/T(30% deposit, 70% before shipment), L/C at sight
Q: When is your company delivery time?
A: For small model of machine, our delivery time is within 100 days, It depends on your machine model.
Q: How many workers will need to operate the machine?
A: 3~6 workers for one line, need one skillful stuffs for adjusting the machine rollers.
Q: How long will take to change the roller on the machine?
A: If one worker to change the roller, will need about 4~6 hours to change , But sometime is according to the worker whether have enough familiar to decide.
Q: How many tons for normal machine to production per month?
A: Our machine is according to the model to decide , under the situation, one machine can produce 1400 tons per month.
Q: How we get from the machine for after service?
A: We will supply technical support for installation , operation and maintain etc ,Also we can arrange the technical engineer to your company .
Contact Person: Ms. Shelly
Tel: +8618752708773